This project consisted of construction of 3 off shore reefs parallel to the main breakwater to limit wave overtopping of the main breakwater. The project has increased safety of the harbor and longevity of the main harbor breakwater.
Project was awarded to Kelly Ryan Inc of Seattle March 1999, and the project completed in the January of 2002.

This project consisted of dredging the Harbor entrance channel to a depth of -32' MLLW; dredging to expand the mooring basin to 11.7 acres at a depth of -29' MLLW; upgrade the offshore breakwater reefs to limit scour along the main breakwater; construct a wave disipation fill to limit wave height within the harbor; and dredge a basin to intercept drifting sand into the harbor. The project has increased maneuverability and safety for vessels entering and utilizing the harbor.
Water circulation to the Salt Lagoon was also enhanced through construction of a splitter breakwater at the mouth, and dredging the channel into the Salt Lagoon.
Project was awarded to Kelly Ryan Inc of Seattle June 27, 2003, and the project completed in the September of 2005.
Saint Paul Harbor May 25, 2006

This website is maintained by the City of Saint Paul's Engineer. All of the data on this web site is for informational purposes. While all efforts are made to insure the accuracy of the data on this site it is the responsibility of the end user of this data to insure the accuracy and suitability of the information and end user assumes all responsibility for actions and decisions based on this information.
Main Harbor Aerial (jpg, 1.01 MB)
For further assisantance contact the U.S. Army Corps of Engineers, the City of Saint Paul, or the City Engineer.
U.S. Army Corps of Engineers, Alaska District
City of Saint Paul
City Engineer: